InterconnectInterconnection of Phases I and II thus completing the entire GCC Power Grid – completed in 2011. The Phase III of the GCC interconnection linked the networks of Kuwait, Saudi Arabia, Bahrain, Qatar (North Grid) and the United Arab Emirates and Oman (South Grid). The system components of Phase III include: